DSpace Repository

KOMPOSISI PENGGUNAAN TENAGA KERJA ORGANIK DAN TENAGA KERJA SUBCONTRACTOR TERHADAP WAKTU DAN BIAYA PEMBANGUNAN KONSTRUKSI BADAN KAPAL PERINTIS 2000 GT